The Construction Process of a Post Frame Building
![]() |
![]() |
![]() |
Materials for your post-frame building are delivered to your prepared site, offloaded - holes are dug for poles
![]() |
![]() |
![]() |
| pre-cast concrete pads are placed in holes | poles are set | framing begins by installing girts |
![]() |
![]() |
![]() |
| engineered trusses are installed | steel siding, trim and insulation installed (if included) | roof panels installed |
![]() |
![]() |
![]() |
| interior view of post frame building near completion of construction | post frame building awaiting installation of optional doors and concrete. |